Send Message
Home

Qingdao Jurong ENGINEERING&TECHNOLOGY Co., Ltd. quality control

Certification
China Qingdao Jurong ENGINEERING&TECHNOLOGY Co., Ltd. certification
China Qingdao Jurong ENGINEERING&TECHNOLOGY Co., Ltd. certification
I'm Online Chat Now
QC Profile

The warranty period is 12 months

Warranty response mode and response time: User phone repair service response time is 2 hours, I have a user repair service within 10 minutes after the problem feedback to after-sales service maintenance department, and the after-sales maintenance department phone repair service actively, 0.5 hours to know the repair problem, determine the solution 1 hours, if can tell clearly and solve problems within the phone, 2 hours to solve the problem; If the problem cannot be solved by telephone, send professional and technical personnel to the site of the faulty equipment for repair until the equipment is restored to normal use.

1) Upon receipt of the notice, we shall repair or replace the defective goods or parts at a reasonable speed and free of charge within the time specified in the "Special Terms of Contract Data Sheet".

2) If we fail to remedy the defects at a reasonable speed within the time specified in the contract after receiving the notice, Demander may take necessary remedial measures, provided that the risks and costs thereof shall be borne by us, and the other rights exercised by Demander against us under the Contract shall not be affected.

After-sales service plan and charge details after the expiration of warranty: lifelong free on-site maintenance service for equipment, cost charges for equipment original parts, vulnerable parts of equipment, accessories quoted price enjoy 20% discount price for replacement and maintenance.

 

Quality assurance commitment:

Quality assurance measures:

1. To create high-quality equipment is the endless pursuit of quality by all employees of our company. Everyone sets up the "hundred-year plan, quality first" thought, strict requirements, excellence, with high standards, high quality to complete the project.

2. Take the initiative to accept the supervision and guidance of the local quality and technical supervision department and the owner, and strictly implement the national regulations, norms and standards.

3. Project, technical management personnel and workshop personnel should be familiar with the drawings, master the standard specifications, do a good job of equipment technical disclosure, so that the operator can operate according to the process requirements.

4. Strictly implement various management systems and quality assurance manuals, conscientiously apply statistical techniques, strengthen quality information feedback, timely solve quality problems in the work, so as to continuously improve the quality of equipment and ensure good product quality.

5, adhere to the "three no" construction, no technical measures are not allowed to construction, measures do not disclose is not allowed to construction, although there is a disclosure but the disclosed person is not clear is not allowed to construction.

6. Adhere to the "three inspection and three pre-control", namely, self-inspection, mutual inspection and special inspection. Quality is mainly pre-control. Dynamic tracking inspection is carried out in production and processing.

7, adhere to the "three who", that is, who is in charge of construction who is responsible for quality, who is in charge of technology who supervises quality, who operates who ensures quality.

8, engineering and technical content of the archives to construct time should be synchronous with the project schedule, should have the validity and accuracy, completeness, and, in turn, the quality of technical preparation, the quality of the materials, spare parts and in good condition, quality factor, the operating process discipline, quality inspection, show certificates, measurement testing, instrument calibration, etc. For effective control and management.

9, equipped with a full-time electrode drying, welding line energy detection personnel, and in accordance with the relevant provisions, strict implementation, carefully record.

 

Security measures:

SIIGC/QEOHSMS1-2002 Management Manual

SIIGC/QEOHSMS2-2002 "Management System Procedure Document"

SIIGC/QEOHSMS1-2002 Administrative Documents

1, to ensure safety organization measures

1) All production personnel shall strictly implement the rules and regulations related to safety and fire prevention of the construction unit. Violators shall be punished.

2) During the production period, when there is hot work, it must apply for the hot work notice from the relevant department of the construction unit, and the fire can be started only after it is approved.

3) All construction personnel shall not smoke in the workshop.

4) The production site must establish a sound safety organization, clear safety post responsibility system, adhere to the "three no" construction principle, put an end to illegal command and illegal operation.

5) Full-time safety personnel shall be set up at the production site to be responsible for on-site safety supervision and inspection.

6) Production site safety leaders should often go deep into the site for safety inspection, find the site unsafe factors and safety hidden dangers, and put forward rectification plans.

7) The person in charge of production shall personally carry out safety day activities, strengthen safety education of employees, strengthen the awareness of safety production, adhere to the "three no let go" so that the safety work is often carried out in depth.

8) Adhere to the safety quick meeting system before the daily shift, point out the unsafe factors in production through the safety meeting, put forward protective measures and matters needing attention, so as to attract the attention of operators and ensure the safety of production.

2, electricity safety measures

A. For temporary power circuits on site, insulated flexible cables must be used and erected according to regulations, and random laying and connecting are not allowed. Temporary power lines should be erected at high altitude as far as possible. Protective measures should be taken for aisles and steering, and marks should be set on the ground.

B. In case of temporary power failure on site, cut off all power supplies immediately and lock the switch box.

C. All kinds of special electrical equipment on site should be used by special personnel.

3, fire safety measures

A. In order to prevent fire, a voluntary fire fighting organization shall be established and trained carefully to enable it to have certain fire fighting knowledge and ability, prevent or reduce the occurrence of fire, and effectively control the spread of fire.

B. The production site shall be equipped with suitable fire extinguishing materials and tools, and shall be equipped with sufficient fire extinguishing equipment.

C. The iodine tungsten lamp for lighting should be securely installed with a distance of more than 4m from the front and 1m from the back to the combustible material.

D. During welding, special personnel shall be assigned to carry out fire prevention monitoring at the operation site. During the welding process, when replacing the electrode, do not throw the electrode head.

Certification
  • China Qingdao Jurong ENGINEERING&TECHNOLOGY Co., Ltd. certification

    Standard:CE

    Number:ICRPOLSKAVCUA220305

    Issue Date:2022-03-21

    Expiry Date:2027-03-20

    Scope/Range:Cleaning Equipment

    Issued By:ICR Polska Co.Ltd.

  • China Qingdao Jurong ENGINEERING&TECHNOLOGY Co., Ltd. certification

    Standard:ISO9001

    Number:29022Q12542-10ROS

    Issue Date:2022-10-09

    Expiry Date:2025-10-08

    Scope/Range:Design, development, assembly and sales of cleaning equipment; Underwater cleaning service for ships

    Issued By:ZhongTai

Contact Details
Qingdao Jurong ENGINEERING&TECHNOLOGY Co., Ltd.

Contact Person: Mr. Qin xiangpeng

Tel: 18560612551

Fax: 86-0532-67794950

Send your inquiry directly to us (0 / 3000)